• Skip to content
  • Skip to navigation
London Borough of Havering home Print Fallback Logo
  • Login to accounts
  • Home
  • Adult social care
  • Benefits
  • Births, deaths and marriages
  • Business in Havering
  • Children and families
  • Citizenship
  • Community
  • Consultations
  • Council and democracy
  • Council Tax
  • Elections and voting
  • Environment
  • Finance, pensions and data
  • Housing
  • Libraries, parks and leisure
  • Parking, roads, transport and travel
  • Planning and building control
  • Public health
  • Regeneration
  • Rubbish and recycling
  • Schools, early years and education
  • Contact us
  • Disruptions to services
  • Emergency planning
  • Events
  • Jobs
  • Login to accounts
  • Maps
  • News
  • Pay the Council
Between 21 and 31 October 2025 there will be a limited planning service

Between 21 and 31 October 2025 there may be disruption to planning, building control and land charges services due to scheduled IT works and upgrading of various back office systems.

This may include (but is not limited to) planning searches (accept or return), searches of the Local Land Charges Register, viewing online documents, online reporting or submission forms, application processing (planning, building control, street naming and numbering) or responding to queries.

The online building control site inspection booking form will be suspended during this time however requests can be made by emailing building_control@havering.gov.uk or calling 01708 432700.

 

Submission documents for community infrastructure levy

  1. Home
  2. Planning and building control
  3. Planning
  4. Submission documents for community infrastructure levy
  • CIL-CD01 Statement of compliance v3  PDF 118kB download

    • PDF
    • 118kB
    • Download
  • CIL-CD02 Draft Charging Schedule  PDF 525kB download

    • PDF
    • 525kB
    • Download
  • CIL-CD03 Statement of representations made v6  PDF 381kB download

    • PDF
    • 381kB
    • Download
  • CIL-CD04 Infrastructure Funding Gap Report  PDF 1.07MB download

    • PDF
    • 1.07MB
    • Download
  • CIL-CD05 Havering Infrastructure Delivery Plan  PDF 1.31MB download

    • PDF
    • 1.31MB
    • Download
  • CIL-CD06 Draft Regulation 123 List (Submission Version) v2  PDF 18kB download

    • PDF
    • 18kB
    • Download
  • CIL-CD07 Viability Assessment  PDF 7.07MB download

    • PDF
    • 7.07MB
    • Download
  • CIL-CD08 Note on the approach to Section S106 v3  PDF 119kB download

    • PDF
    • 119kB
    • Download
  • CIL-CD09 Note on S106 income v2  PDF 51kB download

    • PDF
    • 51kB
    • Download
  • CIL-CD10 Statement of representations procedure  PDF 49kB download

    • PDF
    • 49kB
    • Download
  • CIL-CD11 Responses to consultation on the Preliminary Draft Charging Schedule  PDF 209kB download

    • PDF
    • 209kB
    • Download
  • CIL-CD12 Viability Evidence - Retail Warehouse Sensitivity Test  PDF 36kB download

    • PDF
    • 36kB
    • Download
  • CIL-SD00 Draft Regulation 123 List (Consultation version)  PDF 67kB download

    • PDF
    • 67kB
    • Download
  • CIL-SD01 Preliminary Draft Charging Schedule  PDF 543kB download

    • PDF
    • 543kB
    • Download
  • CIL-SD02 Infrastructure Evidence Base Report for PDCS  PDF 435kB download

    • PDF
    • 435kB
    • Download
  • CIL-SD03 Viability Appraisal Assessment for PDCS  PDF 4.01MB download

    • PDF
    • 4.01MB
    • Download
  • CIL-SD04 Representation from Romford Civic Society  PDF 60kB download

    • PDF
    • 60kB
    • Download
  • CIL-SD05 Representation from Mark Jones  PDF 70kB download

    • PDF
    • 70kB
    • Download
  • CIL-SD06 Representation from Natural England  PDF 224kB download

    • PDF
    • 224kB
    • Download
  • CIL-SD07 Representation from Historic England  PDF 56kB download

    • PDF
    • 56kB
    • Download
  • CIL-SD08 Representation from Sport England  PDF 196kB download

    • PDF
    • 196kB
    • Download
  • CIL-SD09 Representation from Port of London Authority  PDF 191kB download

    • PDF
    • 191kB
    • Download
  • CIL-SD10 Representation from Ruth Crabb  PDF 103kB download

    • PDF
    • 103kB
    • Download
  • CIL-SD11 Representation from Mercury Shopping Centre (Williams Gallagher)  PDF 374kB download

    • PDF
    • 374kB
    • Download
  • CIL-SD12 Representation from TfL  PDF 175kB download

    • PDF
    • 175kB
    • Download
  • CIL-SD13 Representation from Environment Agency  PDF 297kB download

    • PDF
    • 297kB
    • Download
  • CIL-SD14 Representation from Portland Capital (Quod)  PDF 205kB download

    • PDF
    • 205kB
    • Download
  • CIL-SD15 Representation from Highways England  PDF 172kB download

    • PDF
    • 172kB
    • Download
  • CIL-ER01 Examiner Final Report May 2019  PDF 249kB download

    • PDF
    • 249kB
    • Download
Was this information helpful?
  • Facebook
  • Instagram
  • X
  • YouTube
  • About us
  • Contact us
  • Moving in or out?
  • Privacy notice
  • Sign up to newsletters
  • Translate

2025 © London Borough of Havering

Designed and Powered by Jadu.

London Borough of Havering home Print Fallback Logo